Arcola Elementary, 41740 Tall Cedars Parkway, Aldie. Virginia DEQ's records show 5 data centers within 2 miles: 2 planned, 3 operating. 3 within 1 mile.
14 filings (land-use applications and site plans) that mention a data center, from Loudoun County records; 9 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
See LEGI-2023-0090 for all documents, timelines and workflow - RACEFIELD SUBSTATION : A Commission Permit for a Utility Substation to serve planned data center and an existing data center on property.
-
(Conditional Approval) ARCOLA (name withheld) PROPERTY : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR TWO DATA CENTER BUILDINGS WITH ASSOCIATED INFRASTRUCTURE, IN THE PLANNED DEVELOPMENT- GENERAL INDUSTRIAL (PDGI) ZONING…
-
IAD12 & IAD13 DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR CONSTRUCTION OF TWO (2) DATA CENTER BUILDINGS AND ASSOCIATED ROADS, UTILITIES, AND AN OFFSITE STEP POOL CONVEYANCE SYSTEM, IN THE…
-
IAD11 DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONSTRUCTION OF THE ELECTRICAL SUBSTATION WITH ACCESS ROAD TO CONNECT TO AN EXISTING ACCESS ROAD, IN THE PLANNED DEVELOPMENT- INDUSTRIAL PARK…
-
IAD11 DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF 1 DATA CENTER BUILDING, IN THE PLANNED DEVELOPMENT-INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
JK Technology Park #2 - STPL for construction of two (2) data center buildings with associated infrastructure and relocation of pond proposed with future Dulles West Boulevard (designed with CRCP-2020-0012)
-
(Conditional Approval) JK TECHNOLOGY PARK #3: Proposed Data Center and associated infrastructure (STPL)
-
Site Plan for 2 proposed Data Center buildings, guard booth and all associated infrastructure.
-
YONDR-TARRING SPEX-2025-0128: A Special Exception to permit a data center use in the General Industry (GI) Zoning District SPEX-2025-0144: A Minor Special Exception to eliminate the berm and fencing requirements along a…
-
(Conditional Approval) (STPL) ALLEGRO NORTH CAMPUS - BLDG 2A: Data Center and support facilities.
-
ALLEGRO NORTH CAMPUS - BLDG 2B-2E: The Site Plan is for Buildings 2B-2E of the North Campus of a data center complex with associated support facilities.
-
(Conditional Approval) PROJECT MOTION - PH 4: Site Plan for Data Center and support facilities.
-
PROJECT MOTION PH 3: Site Plan (STMP) for Data Center and support facilities.
-
CLINTMAR DATA CENTERS: The development of vacant parcels to provide a 2-story Data Center with associated infrastructure and improvements.
Straight-line distance from the school's location (National Center for Education Statistics).
Virginia's 2026 siting law requires a sound study covering schools within 500 feet of a new high-energy
facility before a county can approve it.