Farmwell Station Middle, 44281 Gloucester Pkwy, Ashburn. Virginia DEQ's records show 24 data centers within 2 miles: 1 planned, 23 operating. 1 within 1 mile.
-
Operating 21271 Smith Switch Rd, Ashburn · Loudoun County · air permit May 8, 2024
-
Operating 44610 Guilford Drive, Ashburn · Loudoun County · air permit Jan 13, 2016
-
Operating 44470 Chilum Pl, Ashburn · Loudoun County · air permit Apr 28, 2009
-
Operating 45005 Russel Branch Pkwy, Ashburn · Loudoun County · air permit Oct 13, 2011
-
Operating 20945 Loudoun County Parkway, Ashburn · Loudoun County · air permit Jul 29, 2026
-
Operating 44725 Gigabit Plaza, Ashburn · Loudoun County · air permit Apr 6, 2026
-
Operating 44480 44520 44521 Hastings Dr and 44490 Chilum Pl, Ashburn · Loudoun County · air permit Aug 23, 2017
-
Operating 44245 Gigabit Plaza, Ashburn · Loudoun County · air permit Jul 11, 2025
-
Operating 44664 Guilford Dr, Ashburn · Loudoun County · air permit Nov 11, 2011
-
Operating 21635 Red Rum Dr, Ashburn · Loudoun County · air permit Aug 4, 2025
-
Operating 21551 Beaumeade Cir, Ashburn · Loudoun County · air permit Oct 1, 2024
-
Operating 21571 Beaumeade Cir, Ashburn · Loudoun County · air permit Sep 24, 2024
-
Operating 21745 Beaumeade Circle, Ashburn · Loudoun County · air permit Jul 23, 2025
-
Operating 21741 Red Rum Dr, Ashburn · Loudoun County · air permit Dec 3, 2024
-
Operating 21890 Uunet Drive, Ashburn · Loudoun County · air permit Jul 18, 2022
-
Operating 22001 Loudoun County Pkwy, Ashburn · Loudoun County · air permit Feb 26, 2020
-
Operating 21529 Beaumeade Circle, Ashburn · Loudoun County · air permit Nov 1, 2024
-
Operating 21711 Filigree Ct Ste C, Ashburn · Loudoun County · air permit Mar 19, 2024
-
Operating 21320 Beaumeade Circle, Ashburn · Loudoun County · air permit Aug 27, 2024
-
Operating 22001 Loudoun County Parkway, Ashburn · Loudoun County · air permit Feb 26, 2020
-
Planned 21780 Filigree Court, Ashburn · Loudoun County · air permit Mar 23, 2026
-
Operating 21955 Loudoun County Parkway, Ashburn · Loudoun County · air permit Feb 12, 2025
-
Operating 21800 Beaumeade Circle, Ashburn · Loudoun County · air permit Nov 13, 2023
-
Operating 22175 Beaumeade Circle, Ashburn · Loudoun County · air permit Oct 17, 2025
21 filings (land-use applications and site plans) that mention a data center, from Loudoun County records; 9 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
Revision associated with this site plan revision include additional floor area for the guard shack booth at the secure entrance to the subject site per approved site plan STMP-2022-0004
-
(Conditional Approval) Ashburn Shallow Bay - Proposed Construction of one Data Center building, Guard Booth, Circulation Drives, and associated infrastructure.
-
ASHBURN CENTER NORTH : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR A PROPOSED DATA CENTER, IN THE PLANNED DEVELOPMENT-INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Conditional Approval) Datacenter site revision updated building footprint for Building 2, revised storm sewer layout, revised parking, gate and fence location, access road and curb and gutter updated, water and…
-
EQUINIX ASHBURN NORTH: A Special Exception (SPEX) for Data Center Use and a Special Exception to exceed a 0.60 Floor Area Ratio on a 44-acre property in the Industrial Park (IP) Zoning District.
-
Gen yard design for a data center
-
EQUINIX AT BEAUMEADE TECH CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO PROPOSE CONCRETE PADES ON NORTH SIDE OF EXCISTING BUILDING (DC-2) TO INSTALL GENERATORSAND AIR CONDENSING UNITS FOR THE EXISTING…
-
Site Plan for development of 3 Data Center Buildings
-
AREP BEAUMEADE DATA CENTER - Revision to previously approved STMP-2021-0006 and SPAM-2022-0033 to add 19 parking spaces
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO TEH PREVIOUSLY APPROVED STMP-2021-0006, IN THE (PDIP) PLANNED DEVELOPMENT- INDUSTRIALPARK ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES REVISION (CPAR) TOTHE PREVIOUSLY APPROVED CPAP-2021-0010 FOR CHANGES TO ASSOCIATED WITH SITE STORM SEWER INFRASTRUCTURE, IN THE PLANNED…
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR CONSTRUCTION ON A PROPOSED DATA CENTER AND UTILITIES, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES (CPAP) TO DEMOLISHAN EXISTING BUILDING, PARKING ISLES, SIDEWALKS, AS WELL AS ON-SITE UTILITIES TO BE REPLACED WITH PROPOSED UTLITIES AND…
-
DIGITAL FILIGREE DATA CENTER: Modified Processing (Fast-Track) for proposed Data Center building, with improvements including but not limited to a proposed guard booth, proposed drives aisles, parking, utilities, SWM…
-
QUANTUM PARK: ZCPA-2023-0008: A Zoning Concept Plan Amendment to expand the permitted building envelope for the development of office and data center uses consistent with the PD-OP zoning district, proffers approved…
-
LC3 DATA CENTER: THIS APPLICATION IS AN AMENDMENT TO STPL-2020-0044, TO ADD A PERIMETER SECURITY FENCE AND GUARD SHACK TO THE PREVIOUSLY APPROVED SITE PLAN.
-
ASHBROOK TECH CENTER: Site plan application for the development of three data center buildings with one substation and improvements per applicable proffers.
-
21800 BEAUMEADE CIRCLE : A special exception to the maximum lot coverage from 45% to 55% for a data center.
-
Revisions to an approved Data Center Site plan to make minor site design adjustments to accommodate the updated security gate, gate equipment and security fence. This plan is associated with EPLAN-2023-0078
-
SPAM Application to revise the site layout, grading plan and utility plan to reflect design revisions.
-
EQUINIX ASHBURN EAST: SPEX-2024-0063: A Special Exception to allow data center development up to a 1.0 floor area ratio (FAR). SPEX-2025-0057: A Special Exception to permit a data center use in the Industrial Park (IP)…
Straight-line distance from the school's location (National Center for Education Statistics).
Virginia's 2026 siting law requires a sound study covering schools within 500 feet of a new high-energy
facility before a county can approve it.